INONU-KARTAL PLANTS SUPPLIER DELIVERY
PERFORMANCE GUIDELINES –Updated January
2006
I. SUPPLIER COMMUNICATION - 25
POINTS
·
ASN
Performance
CALCULATION
ASN timeliness &
accuracy percent is determined by dividing the number of
manual part receipts plus the number of consolidator
ASN’s by the total number of part receipts plus
consolidator ASN’s, and then subtracting this percent
from 100. The first inaccurate ASN record will cause a
maximum point deduction of 3 points, the second
inaccurate ASN record a maximum point deduction of 10
points.
MATRIX
ASN timeliness &
accuracy
|
Percent
|
Points
deducted
|
Percent
|
Points
deducted
|
100.00 –
99.50
|
0
|
94.99 – 94.50
|
10
|
99.49 – 99.00
|
1
|
94.49 – 94.00
|
11
|
98.99 – 98.50
|
2
|
93.99 – 93.50
|
12
|
98.49 – 98.00
|
3
|
93.49 – 93.00
|
13
|
97.99 – 97.50
|
4
|
92.99 – 92.50
|
14
|
97.49 – 97.00
|
5
|
92.49 – 92.00
|
15
|
96.99 – 96.50
|
6
|
91.99 – 91.50
|
16
|
96.49 – 96.00
|
7
|
91.49 – 91.00
|
17
|
95.99 – 95.50
|
8
|
90.99 – 90.50
|
18
|
95.49 – 95.00
|
9
|
90.49 – 90.00
|
19
|
|
|
below 90.00
|
20
|
·
Deduction No-EDI
Supplier
communicates and receives data via Electronic Data
Interchange (EDI)
- Twenty-five (25)
points monthly deduction for NO EDI connection- (EDI
POINT DEDUCTION NOT APPLICABLE
YET!)
·
Deduction NO CMMS3-(e)DDL
Supplier participates in
the Common Material Management System - (electronic)Direct Data Link
(CMMS3-(e)DDL)
process
- Twenty-five (25) points
monthly deduction for not participating in the process(EDDL POINT
DEDUCTION NOT APPLICABLE YET!)
·
Deduction
Logistics Self-Assessment (LSA)
·
Effective March 1st, 2005 Ford of
Europe have changed the requirements of theSupplier LSA. With the
update in 2006 (starting May 1st, 2006) the “GlobalMMOG/LE” standard will become the
only accepted format.
To all suppliers which currently
have any other format in place (MS9000, MMOG,ODETTE, all
alternatively accepted within the Q1 2nd Edition
requirements), westrongly recommend to take the opportunity to
move to the new standard
alreadywith the upcoming
Update Phase 2005 (starting soon on May 1st,
2005).
Your LSA has to be performed and
entered or updated between May 01 and July31 to be valid for the
upcoming validity period (from August 01 each year to
nextyear’s
July 31). Incomplete documentation will cause point
deductions in yourmonthly Delivery Performance Rating,
which might increase up to 25 points inCategory I (5 – 25
points), see diagram below.
We expect your LSA Update
(Certification Date and Level) yearly to be donewithin the validity
period via the LSA menu the on SPOD. Please be advised
that you should Update it also via GSDB Online Update
Token in FSP (Ford Supplier Portal) hosted by Covisint.
We also strongly expect you to
review and, if appropriate, update your Company’scontacts
and address information in SPOD (under “Supplier Contact
Address”).
Problem
Reports- Category I
·
Five (5) points deduction
for each problem report processed
for:
o
Maintenance of
CMMS3 or SPOD contact data
o
Reaction to
problems
o
Shortage
answering
·
Ten (10) points
deduction for each problem report
for:
o
No reaction to
problem report / supplier letter
o
Retardation of DDL
process
o
SMRT Alert
1-insufficient support of SMRT process
·
Fifteen (15)
points deduction for each problem report
for:
o
SMRT Alert
2-reluctance to support SMRT process
·
Twenty (20) points
deduction for each problem report for:
o
SMRT Concern-cont.
non-support of SMRT process
·
Problem
Reports- Category II
·
Five (5) points
deduction for each problem report processed
for:
o
Behind schedule to
release
o
Cum
Disagreement
o
Delivery not
according to ship frequency
o
Documentation/Labeling
o
Overshipment
o
Packaging
compliance
o
Shipping
discrepancies
o
Window time
adherence
·
Fifteen (15)
points deduction for each
problem report processed for:
o
Supplier caused
constraints / production risk
·
Twenty (20) points
deduction for each problem report processed
for:
o
Delay/insufficient
implementation of action plan
o
Supplier caused
off-line
o
Supplier caused
production-loss
SIM Rating Figures
Please note that the
performance rating figures on the SIM website (Supplier
Improvement Metrics) only
reflect the calculation without any detail behind.
Details can only be obtained via FOSN
Furthermore, delivery data in SIM is only updated once a month (around the
15th of each month). If your ASN data has
been amended you can see the
data in FOSN which is updatedonline. SIM will reflect the
revised score only after the next monthly
update.
How to
dispute a rating
Fill in “Dispute Form” on system and
send explanation including evidence to the responsible
Supplier Delivery Performance contact below via mail or
fax by end of the dispute term.
Inönü Plant :
H. Emrah Gündüz
Phone: +90 222 213 2422
Mail: egunduz1@ford.com.tr
Kartal Plant :
Ýlker Buzluk / Muhammet
Arýkan
Phone: +90 216
5647319/ +90 216 5647335
Fax: +90
216-5647385/+90 216 5647385
Mail: ibuzluk@ford.com.tr
/ marikan1@ford.com.tr
Dispute is to be done monthly when
the data is displayed via SPOD between 1st
and 20th of every month for the previous
month. Status of Dispute Form (Evaluated or Not
Evaluted) can be followed up from
“List Dispute Form”
menu.
Note: Incomplete disputes or
disputes arriving later than deadline will be
disregarded. Only one dispute per
month for each category is accepted.
Action Plan
Please realize that it is
absolutely mandatory to provide an action plan (in
G8DReport format) for every
rating below 81 points. Deadline for doing so is the
end of the
particular dispute term.
6 Months Weighted
Average Calculation
Feb
|
Mar
|
Apr
|
May
|
Jun
|
Jul
|
Aug
|
Sep
|
Oct
|
Nov
|
Dec
|
Jan
|
Feb
|
90
|
89
|
94
|
89
|
86
|
76
|
72
|
--
|
87
|
74
|
86
|
74
|
86
|
6 months weighted average
= 79,1
How is 6 months weighted
average calculated?
Aug
|
Sep
|
Oct
|
Nov
|
Dec
|
Jan
|
Feb
|
72
|
*
|
87
|
74
|
86
|
74
|
86
|
1
|
2
|
3
|
4
|
5
|
6
|
**
|
72
|
0
|
261
|
296
|
430
|
444
|
0
|
1
|
0*
|
3
|
4
|
5
|
6
|
0**
|
Monthly Rating (from
SPOD)
Weight
Weighted Rating
(line 1 x line 2)
Weights used in
calculation
6 months weighted
average: sum of weighted ratings =1503 / 19 = 79,
sum of weights used
* No rating issued for this month -
"blank" months are ignored in both
numerator and denominator for the calculation.
**
Latest rating not used (only "mature" ratings are
used in the calculation).
To calculate a weighted 6 months
average, a minimum of 2 ratings in the relevantperiod must be
available.
SIM Rating Figures
Please note that the performance
rating figures on the SIM website (SupplierImprovement Metrics)
only reflect the calculation in SPOD, without any detail
behind. Details can only be obtained via SPOD.
Furthermore, delivery data in SIM is only updated once a month (around the
15th of each month). If your rating has
been amended you can see the
actual score only in SPOD, which is updated
online. SIM will reflect the revised score
only after the next monthly
update.
Q1 2nd Edition
Please note that the
minimum requirements for getting your MP&L CustomerEndorsement
signed are the
following:
-
Delivery history
of at least 6 consecutive months
-
6 months weighted
average exceeds 80 points
-
Monthly Delivery
Rating for each of the 3 most recent
monthsis greater than 80
points
-
Logistics
Self-Assessment (Global MMOG/LE)
compliance
-
SPOD Contact data
filled
-
CMMS3 (screens
FBBA / FCBA) filled
-
Concurrence of
our SMRT-Team
A summary of Q1
2nd Edition requirements focusing on
logistics aspects:
-
This publishing
includes suppliers to Ford as well as suppliers to
Jaguar,Volvo, Land Rover
and Ford Otosan (accompanied by an introduction
letter
signed by top
management of the specific brand).
-
To qualify for
the Q1 Award, all supplier sites must be external
manufacturinglocations of
production or service parts.
-
All suppliers are
required to satisfy these requirements regardless of
existingQ1
status.
-
Capable systems
are:
-
QS9000 /
TS16949 and ISO14001
-
Logistics
Self-Assessment of Material Management
System:
2005: MS9000, MMOG,
ODETTE, Global MMOG LE
2006: Global
MMOG/LE
-
Ongoing
Performance Metrics determining a supplier’s Q1 Score
are:
-
Field Actions /
Stop Shipment / PPM Performance
=> owned /
controlled by STA
-
Delivery
Performance Production
=> owned /
controlled by MP&L
-
Delivery
Performance Service
=> owned /
controlled by FCSD
-
Metrics are
reported in SIM (Supplier Improvement Metrics) for the
totalpicture of a
supplier’s site(s) total quality
score.
-
Suppliers are
responsible for the total quality of the goods and
services theyprovide to Otosan.
This includes their control and responsibility for the
quality of any supplier that provide them with their
product.
-
The Manufacturing
Site Assessment addresses ‘Planning and
Demonstrationof Manufacturing Process
Capability’, ‘Variability Improvements’ (ConsumerDriven
6-Sigma), ‘Manufacturing Efficiencies’ and ‘Customer
Satisfaction’. Allsuppliers must review this
assessment bi-annually or annually as designatedby
STA.
-
All suppliers
seeking the Q1 Award must provide customer
endorsementsfrom each Ford plant that
receives a supplier’s product. Endorsements arealso
required from MP&L, STA and FCSD (for service
parts). Sites currentlywith Q1 do not need
to obtain new customer endorsements to meet Q1
2ndEdition
criteria.
Q1 Total
Score Suppliers must maintain an overall
score of at least 800 points to obtain / retain Q1status.
Every site begins with a 1,000 point Q1 score.
Scoring
Thresholds:
- Field
Action
controlled by STA
- Stop
Shipment
controlled by STA
- PPM Commodity
Performance
controlled by STA
- PPM (6 Month
PPM)
controlled by STA
--- Delivery Rating ---
--- Metric ---
--- Points ---
--- Q1 Status ---
Production
100 points
+100
points
(NA /
Europe)
97 to 99 points
+ 50
points
81 to 96 points
0 points
3 times below 81
points
-250
points
Revoked
(see
below)
Revocation of Q1
Status
- Lack of
Third-Party Certification (QS-9000 / TS16949,
ISO14001)
- Non-Compliance to
Logistics Self-Assessment
- Unacceptable Manufacturing Site
Assessment, Field Action (withsupplier responsibility), Stop Shipments (with
supplier responsibility),
unacceptable PPM score
- Unacceptable
Delivery Rating (details next point
below)
- Violation of
Trust
- Q1 overall score
falls below 800 points
Revocation
criteria due to Delivery
Performance
- Weighted 6 months
average below 81
points
and
- the last two
mature months below 81
points
and
- the current month
(last rating month) below 81
points
This is for quick
reference only, the complete and official Q1
2nd Edition brochure and additional
information can be accessed via FSP (hosted by
Covisint).
|